Corrosion Protection for a Double Bottom Storage Tank on Concrete Foundation using Zerust's Zerion® FVS via Internal Flood IDS
Corrosion Protection for a Double Bottom Storage Tank on Concrete Foundation using Zerust's Zerion® FVS via Internal Flood IDS
Project Specifics
Installation Dates
February 2023
Location
California, USA
Environmental Conditions
Avg. Temp. 60°F, ~50% humidity, sunny, no breeze
Asset Details
Diameter: 90-ft
Vessel Construction: Double-Bottom, 5” Concrete Foundation, minor slope
Inhibitor Delivery System (IDS)
Internal Flood IDS
Zerust Product(s) Used
Zerion® FVS Corrosion Inhibiting Powder
Problem
The client wanted corrosion protection for a double-bottom, aboveground storage tank with a 5” concrete foundation.
Zerust Solution
The engineers at Zerust® Oil & Gas developed custom solutions for this client and successfully installed an Inhibitor Delivery System (IDS) for the targeted asset and completed the injection of the corrosion inhibiting solution slurry on the tanks using Zerust’s Internal Flood IDS.
Solution Specifics
The five floor ports were welded prior to the arrival of the Zerust team. The contractor’s team used their own port fittings which they assembled themselves. Once the Zerust team arrived on site, injection of Zerust’s Zerion® FVS Corrosion Inhibiting Powder began. 270-gal of water was pumped into the water tank. A hose was then used to connect the water tank and the 55-gal mixing drum, where pails of FVS were mixed in batches with the water using a submersible pump in the drum.
The remaining four (4) hoses were used to connect the drum to the floor ports for injection to gravity feed the solution through the ports. As there were five (5) floor ports, one of the hoses had to be switched up halfway through the injection process. Several small leaks were observed in several areas. To solve this, the team dried the leakage area and applied a spray-on sealant, stopping the leak. The injection process continued without any issues and all materials were successfully injected into the tank.
Results
The IDS installation was completed without an issue. It is recommended that a corrosion monitoring system be installed to monitor the tank’s corrosion status. Contact a Zerust Oil & Gas representative regarding any questions about this report.
Download Case Study PDF